Recently, cold air has continuously moved southward, and temperatures in many parts of the country continue to drop. Low-temperature freezing in winter is a period of high incidence of pump failures. Pump casing freezing and cracking, seal failure, and unit shutdown will all directly affect the stable operation of water supply, circulation, heating, and fire protection systems. M&W ENERGY SAVING has compiled a pump anti-freezing operation guide for you to help you quickly troubleshoot risks.


▲ Frozen and cracked impeller of an irrigation pump in a Northeast China project (left)
▲ Frozen and damaged filter in a Shanxi project (right)
I. Long-term Shutdown Units: Must Completely Drain Accumulated Water
For pumps that are not yet installed, installed but have not been tested with water, or planned for long-term shutdown, the accumulated water in the pump casing and pipelines must be drained before the ambient temperature drops below 0°C.
√ Ensure the inlet and outlet valves are closed, give priority to opening the drain valve at the bottom of the pump casing, and keep it open for more than 1 minute until no water drops.
√ Simultaneously check dead corners prone to water accumulation, such as the inlet section and the lowest points of pressure pipelines.
√ In ice and snow weather, promptly clean the snow on the equipment surface to prevent melted snow water from flowing backward into the pump chamber along the gaps and forming new hidden dangers of water accumulation.
II. Outdoor/Unheated Pump Rooms: Keep Units Running Continuously
Pumps installed outdoors, in outdoor pump rooms, and in unheated workshops are high-incidence areas for freezing damage. Please take pump insulation measures to prevent the pump from freezing due to excessively low temperatures.
√ The most core protection principle in winter is to keep the unit running continuously as much as possible. Flowing media will not easily freeze, fundamentally avoiding the risk of freezing damage.
√ If a temporary shutdown is absolutely necessary, immediately perform a thorough drainage of the entire system at the first moment of shutdown, and add media for operation when in use. The shutdown and drainage operation shall be fully implemented with reference to the standards for long-term shutdown units.
III. Inspection Before Startup at Low Temperatures: Forcible Startup in Frozen State is Strictly Prohibited
Before restarting the pump in a low-temperature environment, it is necessary to manually turn the shaft to confirm the status first, and it is not allowed to directly switch on the power for startup.
√ Pour hot water not exceeding 80°C over the bearing housing for 1 minute. During operation, use a rag to block the oil seal position to prevent hot water from entering the interior of the bearing housing. After pouring, quickly wipe dry the residual water stains on the surface.
√ Pour hot water not exceeding 80°C over the mechanical seal or stuffing box position for 1 minute to gently thaw the frozen sealing parts.
√ After thawing is completed, slowly turn the pump shaft manually to gradually confirm that the rotation is smooth without obvious jamming. Do not use brute force to turn the shaft throughout the process; excessive turning resistance indicates that there is still residual ice inside. Forcible startup is strictly prohibited to avoid damaging the impeller and burning out the motor.
√ After the ice layer is completely melted and the shaft turning verification shows no abnormalities, first perform a short-time jogging test to confirm the operating status, and then officially put it into working condition operation.
If the entire pump is accidentally frozen, please contact the M&W ENERGY SAVING after-sales service department immediately. Do not forcibly thaw it without authorization.
IV. Daily Inspection: Fill Protection Blind Spots
√ Before winter, comprehensively check the internal heating and dehumidification devices of the control cabinet to prevent low-temperature condensation from causing failure of electrical components and protection malfunctions.
√ Appropriately increase inspection frequency during cold waves. If pipeline frosting or abnormal outlet flow is found, shut down in time for troubleshooting.
√ Focus on checking the protection level of the control cabinet. For equipment installed outdoors, confirm that the cabinet door seal is intact to avoid the intrusion of cold wind and moisture.
According to on-site fault statistics of M&W ENERGY SAVING in recent years, more than 90% of pump freezing and cracking originate from a fluke mentality. The four core points of winter anti-freezing: drain without leaving dead corners, insulate without saving processes, do not forcibly start when frozen, and do not inspect perfunctorily. By doing basic operations well, the vast majority of freezing damage accidents can be avoided in advance. This winter, M&W ENERGY SAVING and you will together guard the defense line for the safe operation of pumps.